Message Board > General :: General Talk :: > China Flange suppliers

China Flange suppliers - Posted By Vvasfg23 (vvasfg23) on 16th Jan 23 at 1:51am
China Flange suppliers Product description
Item:Stainless steel flange
Flange MaterialStainless steel ASTM A182, F304/304L, F316/316L
Specificationé”›?/p>DN10-1000 etc.
Flange Type:1. Welding neck flange;
2. Slip on
3. Blind flange
4. Long welding neck flange
5. Lap joint flange
6. Socket welding
7. Threaded flange
8. Flat flange
Technics:Forging
Flange Standard:
ANSI
Class 150 Flanges-Class 2500 Flanges
DIN
6Bar 10Bar 16Bar 25Bar 40Bar
JIS
5K Flanges-20K Flanges
UNI
6Bar 10Bar 16Bar 25Bar 40Bar
EN
6Bar 10Bar 16Bar 25Bar 40Bar
Packing:Carton/plywood case
Brand Name:zhongtou/ZT
According to customer needs
Price:According to quantity
Original:Zhe Jiang, China
Payment term:TT, LC
Delivery date:According to the order quantity, In stock within seven days,out of stock takes 30-40days
Sales Terms:FOB TO NINGBO O SHANGHAI
EXW
Warranty:1 year
Certificate:ISO
Main Market:Europe/North America/South America/Middle East/ Africa/Asia
Transportation:sea/air/express
Supply Ability:100000 Piece/Pieces per Week
Application:Flanges are usually used in constructions, petroleum, chemical industry, power, shipbuilding, paper making, metallurgy, water supply and sewage work, light and heavy industry, plumbing, and electricity, etc.
Our workshop
ZHONGTOU VALVE has the most advanced producing and testing equipment . We can totally satisfy your requirement.
Production Flow
Raw material
Forge
CNC machine
Drill machine
Assemble
Product inspection
Finished product warehousing
Packaging
Transportation
Advantage
A. We are an experienced factory
B. Advanced equipment such as Mazak CNC machine, sawing machine, spectrometer, bench Chardness tester, laser marking machine, coating thickness tester
C. We can do OEM & ODM
D. We have over 200 products for your one-stop shopping
FAQ
Q: How long is the production cycle?
A: Usually it takes 20-40 days for production, we also have a lot of stock to guarantee the delivery time.
Q: Can the product be customized as our need, such as put on our logo?
A: Yes, we can do it, we can use laser to print text or logo.
Q: What is your ordering process like?
A: Our company makes quotations based on the purchase list received including product size, material, quantity, and pictures. After the purchaser approves the price, our company provides technical drawings, delivery time, payment method, product packaging, and product logo to the customer for negotiation and confirmation. After the confirmation, we issue PI, and the purchaser pays the full payment or deposit. It takes about 40 days for our company to produce, and we will contact you a few days before the production is completed to discuss the delivery details.
Q: What is your term of payment?
A: 30% down payment before producing and 70% balance payment before shipping.TT 100% required for orders below $5,000China Flange suppliers
website:http://www.chinaztvalves.com/flange/